From general structure of the plan, a distinction could be draw between plans that rely on the abstraction of activity and those that rely on stages.

1. Activity-based plan

Activity-based plans works analoguesly in the whole lifecyle of the plan: by performing activities.

Typically, a list of activities would be present, each of them would contribute to the objective, and all of them would be performed repeatedly thorough out until the objective is accomplished.

examples are work out plans and studying routine.

corresponding to unstructured approach

2. stage-based plan

Typically, every task in stage-based plan would be done exactly once, and the plan feels a lot like script.

examples be event/party plan(buy this, make that, cook those).

corresponding to structured approach